The intelligence layer for structural steel.

Trager turns drawings, models and revisions into checked, fabrication-ready information. For detailers, fabricators and structural engineers.

Frame built from the takeoff

W16×40 TYP.W16×40 TYP.6.0 m6.0 m6.0 m6.0 m6.0 m6.0 mABCDE123ProjectTower BDrawingS-104 · Rev CSheetFraming planScale1:100C1C2C3C4C5C6C7C8C9C10C11C12C13C14C15B1B2B3B4B5B6B7B8B9B10B11B12B13B14B15B16B17B18B19B20B21B22VB1VB2VB3VB4EL +0.00EL +3.60EL +7.20EL +10.80

Steel estimate

from S-104 · Rev C

  • ColumnsW12×65, 45 pieces, 162 m15.7 t
  • Beams, grid 1–3W16×40, 36 pieces, 216 m12.9 t
  • Beams, grid A–EW16×40, 30 pieces, 180 m10.7 t
  • BracingL4×4×½, 24 pieces, 168 m3.2 t
  • Plates and connections5% allowance2.1 t
Total steel44.5 t

Drawings are still read by hand. Every revision means recounting, rechecking and reissuing, and one missed change reaches the shop floor.

Trager in three parts.

  • 01

    Reads the drawing

    Grids, members, dimensions and revisions from the GA.

  • 02

    Understands the steel

    The same frame as a model, every piece and connection named.

  • 03

    Releases to the shop

    Single-part drawings, cut lists and NC files, signed off by a person.

Trager, in more detail.

What it reads, checks and releases.

Document intake and take-off
PDF and DWG sets read in. Members, plates, bolts and weights taken off.
Revision diff
Rev B against Rev C: every affected piece listed, nothing missed.
Checks and RFIs
Marks, connections and clashes checked. Open questions drafted and tracked.
Shop outputs
GA, assembly and single-part drawings, BOM and bolt lists, DSTV NC1 and DXF, IFC.
Flagged, never guessed
Uncertain items go to a person. Sign-off stays where the contract puts it.
Inside Tekla and SDS2
Coming next: Trager inside the tools your team already runs.

What a day looks like.

  • Detailing companyRev C

    Revised drawing in. Seven pieces affected, each one flagged.

  • Structural engineerRFI-014

    An open question drafted and tracked against the drawing.

  • Steel fabricatorNC1

    Part list, cut list and NC files released on one controlled revision.

Small first step.

  1. 1

    Bring one finished project

    Drawings, the native model and the shop outputs you shipped.

  2. 2

    Scored against what you shipped

    Ten tests against your approved model, BOM and NC files.

  3. 3

    Shape what goes live

    One verdict, up to the first-off part. Then a live project.

Bring one finished project. We will show you what Trager reads.

Drawings, the native model and your shop outputs. That is all we need.